Looking for something?
A place, an idea, a question. Find the articles that interest you.
Articles to discover
BUFO in Alsace: why the green toad also frequents developed sitesQuarry ponds, retention basins and terrestrial areas: this amphibian’s needs are not limited to landscapes that appear natural.
Nepal: how a warning given just minutes ahead protected 900 pupilsOn 26 August 2026, a school in Nuwakot evacuated around 900 pupils before a devastating flood. A look back at a decision made in a matter of minutes.
GoGo VELO: what 490,000 km cycled in Luxembourg tell usGoGo VELO brought together around 1,250 people and exceeded 490,000 kilometres in autumn 2026. A look back at the results, the campaign’s history and what these figures say about travel by bike.
Pedibus in Luxembourg: a guide for families and chaperonesHow does the Pedibus work in Luxembourg? Routes, timetables, registering children, recruiting chaperones, allowance, training and official contacts.
Linking neighbourhoods on foot and by bikeThe City presents corridors and connections for improvement. Their feasibility must be assessed before they can be scheduled.
Forests supported to change how they are managedRhineland-Palatinate is publicising the reopening of the KWM programme. Deadwood, soils and habitat trees give these commitments practical substance.
BELU: linking Arlon and Steinfort by bikeStations, junctions and existing cycle routes: the cross-border project is setting up several connections, with overall completion announced for early 2028.
RAVeL: choosing your section towards LiègeLines 38 and 39 link the Three Borders to Chênée over 50 kilometres. Starting point, gradient and return journey: how the two stages affect your plans for a ride.
F1: from the clock to the gridElimination in Q1, a hindered lap, a penalty or a pit-lane start: qualifying measures speed, but does not always determine the starting order.
Space debris: seeing is not enoughThe ESA’s 2026 report points to more fragments that are difficult to identify. Radars, telescopes and impact traces shed light on different parts of the problem.
Fechingen: replacing the bridge without closing the A6In Saarland, the replacement of the Fechingen Talbrücke is reaching a decisive administrative stage. The project plans to keep traffic moving during the works.
FLEX: observing plants beyond their colourLaunched on 15 September with Sentinel-3C, the European satellite is targeting a subtle signal: plant fluorescence. Interpreting it takes more than a beautiful green image.